Collaborate with multidisciplinary teams to formulate and propose development scenarios for the Lang Lebah Project, considering treatment and transportation facilities, production well arrangement, and CCS requirements.
Coordinate and liaise with reservoir engineering, geologists, and geophysicists, engineering, and commercial team to perform long-term development studies and field development plan (FDP) report specific to the Lang Lebah Project, ensuring the achievement of project objectives.
Drive the development of the integrated planning for Lang Lebah gas field development and Carbon Capture and Storage (CCS) as part of the Lang Lebah Project.
Coordinate activities related to CCS including but not limited to CCS regulatory, CCS EIA, storage field depletion and abandonment plan, and the development of the Measurement, Monitoring, and Verification (MMV) Plan specifically tailored for the Lang Lebah Project.
Prepare comprehensive reference documents for pre-projects related to the Lang Lebah Project and collaborate closely with the Pre-Project Team to ensure timely and high-quality study deliverables.
Please, click on the APPLY JOB button to send your CV.